← Bitcoin Mining Operations Index
HUT · Bitcoin miner

Hut 8

quarterly-only · data as of 2026-06-30 · source-cited from public filings

Fill in what's missing →

Verify or contribute data for this company.

3 published
disclosed by the company
4 partial
reported on another basis or partly missing
5 gaps
not published — what we'd like to fill
8 metrics
the index's core set

Metrics

Every figure is derived from a public source — SEC filing or company IR release — and each row links to the exact document it came from. If a figure is off, tell us and we'll fix it (and credit the correction).

BTC treasury partial
8002 (ABTC) BTC · 2026-06-30
Fleet (ASICs / models / efficiency) partial
~89,242 rigs; 13.5 J/TH (new) rigs; J/TH · 2026-06-30
Electrical capacity (MW) published
1330 under construction MW · 2026-06-30
Sites published
River Bend, Beacon Point, Drumheller... sites · 2026-06-30
Hash rate (EH/s) partial
~3.05 EH/s added (Drumheller) EH/s · 2026-04-30
Hash cost ($/PH/day) not published
—
BTC produced published
932 (ABTC) BTC/qtr · 2026-06-30
Mining cost ($/BTC) partial
36500 USD/BTC (ABTC) · 2026-06-30

What's not published

These are the metrics Hut 8 does not currently disclose — the gaps we'd like to fill with the company's help. If you can share any of these, we'll cite you as the source and mark Hut 8 as company-verified on the index.

Fill in what's missing → See all companies